Project details
74 KWp,Chilling Plant,Industrial,On-Grid Solar Power Plant with Net-metering
Industrial Project
Project Overview
This facility requires huge amount of electricity to operate upon, which makes the energy charges as one of the notable business expense. Located in Morena, Madhya Pradesh, which has energy demand of about 1 Lakh Units (kWh) every year, they need some solution to stay immune from the skyrocketing energy charges. Solartrade understood their pain point and proposed a solution for 74 KW Grid-Tie Solar Power Plant. This energy solution will generate about 106560 units annually which translates to about 7.5 Lakh rupees in energy cost savings. Apart from the monetary benefits, they have switched to the green and clean energy ecosystem for the well being of our environment.
Project Location
Morena, Madhya Pradesh
Completed On
21 Jan 2022
Project Specification
Capacity
74 KWp
PV Module
450wp -Mono PERC Halfcut
Inverter
Havells
Structure
Hot Dip GI
Project Benefits
Yearly Generation
106560 Units
Payback Period
4 Years
Carbon Offset
2100 Tonnes
Trees Equivalent
2775 Trees